Blacklick Creek Greenway Trail & Bridge
The trail winds along 12 miles of Blacklick Creek, from Blacklick Woods Metro Park in Reynoldsburg, to Three Creeks Park. IBI Group designed a one-mile segment of the trail as well as an eight-span pre-fabricated pedestrian bridge over US 33 and Blacklick Creek.
Client
Columbus & Franklin County Metro ParksLocation
Franklin County, OH
$2.2 million
Construction cost
1 mile
New trail segment
8 span
Bridge
Ongoing
Status
IBI Group coordinated all planning and design activities for this project continuing into the construction phase including:
- Trail Design
- Bridge engineering
- FEMA hydraulics
- Land surveying
- Erosion and sediment control
- Utility coordination
- Maintenance of Traffic at US 33
- Drainage/storm sewer design at selected locations
- Cost estimates
Project Leaders
Having worked with qualified consultants throughout my career, IBI Group’s staff’s technical ability was only surpassed by their professionalism, patience, and persistence in helping us keep this project going through late changes requested by review agencies and utilities. Thanks to you and your staff this project is now ready for construction. The high-quality of plans provided by IBI Group and your bidding coordination and assistance, allowed ODOT and Metro Parks to select from eight qualified contractors with extremely comparable cost estimates.
Steve Studenmund
Strategic Planning & Land Acquisition Manager
Columbus and Franklin County Metropolitan Park District